断桥铝门窗施工方案 这些常识你必须要懂得! |
添加时间:2017/12/13 15:03:37 浏览次数: |
门窗大企整理的断桥铝门窗介绍及施工方案,这些常识也许对您有用! The introduction and construction plan of the broken bridge aluminum doors and windows arranged by doors and windows, these common sense may be useful to you! 一、断桥铝介绍 1. Introduction of aluminum broken bridge 断桥铝是指隔断冷热桥,铝合金是金属,导热比较快,所以室内外温度相差很多时,铝合金就成了为热量传递的“桥”了,断桥就是将铝合金从中间断开,采用硬塑与两边的铝合金相连,而塑料导热慢,这样热量就不容易传递了,所以叫断桥铝合金。 The aluminum partition refers to cold bridges, Aluminum Alloy metal, heat faster, so the indoor and outdoor temperature difference, Aluminum Alloy became for the heat transfer of "bridge", the bridge is Aluminum Alloy disconnected from the middle of the hard plastic is connected with the Aluminum Alloy on both sides, and the plastic heat slowly. So the heat is not easy to transfer, so it is called the Aluminum Alloy. 断桥铝采用隔热铝型材和中空玻璃,仿欧式结构,外形美观,具有节能、隔音、防噪、防尘、防水功能。这类门窗的热传导系数K值为3W/m2·K以下,比普通门窗热量散失减少一半,降低取暖费用30%左右,隔声量达30分贝以上,水密性、气密性良好,均达国家A1类窗标准。 The broken bridge aluminum adopts insulated aluminum profile and hollow glass, imitating European structure, with beautiful appearance, and has the functions of energy saving, sound insulation, noise proof, dustproof and waterproof. The thermal conductivity K of such doors and windows is 3W/m2. K, less than half of the heat loss of ordinary doors and windows, and the heating cost is reduced by about 30%. The sound insulation volume is above 30 dB, and the water tightness and tightness are all good, which all reach the national A1 window standard. 二、 施工方法及要点 Two, construction methods and key points 2.1 工艺流程:弹线找规矩―→门窗洞口处理―→安装连结件检查―→门窗处理检查―→安装―→四周嵌缝―→五金配件―→清理。 2.1 process: the bomb line to find the rules to install windows and doors processing links, check check to install windows and doors, hardware accessories, caulking around to clean up. 2.2门窗框成品堆放、保管、吊装。进入现场安装前,工程负责人必须对门窗安装队全体人员进行施工交底,并有书面交底材料存档,同时提供安装基准线。 2.2 door and window frames are stacked, stored and hoisted. Before entering the scene, the engineering leader must conduct the construction contact for all the staff of the windows and doors installation team, and have written materials, and provide the installation baseline. 2.3 膨胀螺丝 直接从门窗框内侧打入墙体内,膨胀螺丝的长度不低于80mm,每相邻的膨胀螺丝间距不大于500mm。 The 2.3 expansion screw directly enters the wall from the inside of the door and window frame, the length of the expansion screw is not less than 80mm, and the distance of each adjacent expansion screw is not more than 500mm. 2.4 门窗框与墙体之间的接缝处理方法:用发泡剂填充框与墙体间间隙,发泡剂溢出来的部分,用铲刀铲平,然后抹水泥将其盖住,等水泥干燥后,再均匀地在接口处打密封胶。 Treatment method of joint between the 2.4 door and window frame and wall filled frame and the wall of the gap between the foaming agent, foaming agent spilled out, with the shovel shovel, and then wipe the cement cover, such as cement after drying, and then evenly sealant in the interface. 三、玻璃安装的技术方法: Three. The technical methods of glass installation: 3.1 安装玻璃前,将裁口内的污垢清除干净,并沿裁口的全长均匀抹1~3mm厚的底油灰。 3.1 before installing glass, dirt cutting mouth clean, and is cut along the mouth evenly with 1~3mm thick bottom putty. 3.2 安装长边大于1.5m或短边大于1m的玻璃,用橡胶垫并用压条和螺钉镶嵌固定。 3.2 installation of glass with long edges more than 1.5m or shorter than 1m, with rubber pads and inlaid with press and screws. 3.3 安装于竖框中的玻璃,应搁置在两块相同的定位垫块上,搁置点离玻璃垂直边缘的距离宜为玻璃宽度的1/4,且不宜小于150mm。 3.3 installed on the mullion of the glass, we should lay aside in the two block of the same location of the pad, aside from the edge of the glass vertical distance appropriate for the width of glass 1/4, and should not be less than 150mm. 3.4 安装于扇中的玻璃,应按开启方向确定其定位垫块的位置。定位垫块的宽度应大于所支撑的玻璃件的厚度,长度不宜小于25mm,并应符合设计要求。 3.4 the glass installed in the fan should determine the position of its positioning pad in the direction of opening. The width of the positioning pad should be larger than the thickness of the supported glass, and the length should not be less than 25mm, and it should meet the design requirements. 3.5 玻璃安装就位后,其边缘不得和框、扇及其连接件相接触,所留间隙应为2~3mm。 When the 3.5 glass is installed, the edge of the glass shall not contact with the frame, fan and its connector, and the clearance shall be 2~3mm. 3.6 玻璃安装时所使用的各种材料均不得影响泄水系统的通畅。 3.6 all kinds of materials used in the installation of glass shall not affect the patency of the discharge system. 3.7 玻璃镶入框、扇内,填塞填充材料、镶压线条时,应使玻璃周边受力均匀。 3.7 glass insert into the frame, fan, fill the filling material, insert pressure line, should make the glass circumjacent force uniform. 四、施工管理 Four. Construction management 4.1 门窗工程计划工期为----------天,门窗工程质量达到合格。 4.1 doors and windows project duration is - day, windows and doors project quality to achieve the qualified. 4.2 按本项目确定的工期与质量承诺的要求,在门窗工程施工中,合理配置生产诸要素,确保施工进度,确保基础工程的施工质量,实现合同目标。 4.2, according to the requirements of the project's time limit and quality commitment, we should rationally allocate all the elements in the construction of doors and windows, ensure the progress of construction, ensure the quality of foundation engineering, and achieve the goal of the contract. 4.3 施工时要合理安排好各工种之间的相互关系、施工顺序,确保有序施工。并合理调配、安排好劳动力,满足施工进度需求。 4.3 in the construction, we should reasonably arrange the relationship between the various types of work and the order of construction, so as to ensure the orderly construction. And rationally allocate and arrange labor force to meet the needs of construction progress. 4.4 根据施工进度及时采购建筑材料,并按规范要求做好进场检验工作。 4.4 purchase the building materials in time according to the construction progress, and do well in the inspection work according to the requirements of the standard. 4.5 在门窗的施工中,严格按相关规范要求施工,确保外墙保温工程的施工质量。 4.5 in the construction of doors and windows, strictly according to the requirements of the relevant specifications to ensure the construction quality of the external wall insulation engineering. 4.6 加强施工过程中的监督指导工作,对门窗施工实行全过程有效控制。 4.6 to strengthen the supervision and guidance in the construction process, and to effectively control the whole process of the door and window construction. 4.7 各工种在施工中要做好班组自检工作及工序报验工作,保证每道工序的施工质量。 4.7 of each type of work in the construction team to do the self inspection and process inspection work, ensure the construction quality of each process. 4.8 按规范要求及时做好质量保证资料的收集、记录、整理工作,确保资料真实、齐全、规范标准且与施工进度同步。 4.8, timely collect, record and arrange quality assurance data according to the specifications, ensure that the data is real, complete, standardized and synchronized with the construction schedule. 五、安全与文明施工 Five. Safety and civilization construction 5.1 门窗工程安全与文明施工目标为:轻伤以上安全事故为零,施工现场整洁文明。 5.1 doors and windows project safety and civilized construction goal: the light injury above the safety accident is zero, the construction site is clean and civilized. 5.2 施工前所有机械设备要进行检验、调试合格并报验后,放可开始使用。使用过程中实行专人负责制,并设专人进行日常的维修及保养工作。 5.2 before the construction of all mechanical equipment should be tested and qualified inspection and debugging, can be started. In the process of use, the special person is responsible for the system, and a special person is set up for daily maintenance and maintenance. 5.3 施工时对施工人员要进行安全教育并讲清安全注意事项。施工中必须严格遵守各项安全规章制度、操作规程,确保安全施工。 5.3 construction of the construction personnel to carry out safety education and clarify the safety precautions. In the construction, the safety regulations and rules and regulations must be strictly observed and the safety construction must be ensured. 5.4 施工材料按要求做到有序堆放,现场保持文明整洁。 5.4 in accordance with the requirements of construction materials, orderly stacking, the site to maintain clean and clean. 5.5 玻璃工程安装时注意玻璃的污染,安装后应进行清理,以保证玻璃的清洁,竣工后的玻璃工程,表面应洁净,不得留有油灰、浆水、油漆等斑污。 5.5 glass installation note glass pollution should be installed after the clean-up, to ensure the completion of the clean glass, glass engineering, surface should be clean, and shall not leave water, putty, paint stains. |
上一页 断桥隔热铝的优点分析 |
下一页 断桥铝门窗防渗漏要求 |
Copyright © 技术支持:遨游网络